Skip to content
  • English
    • српски
  • Home
  • About us
  • Services
  • Projects
  • We in the media
  • News
  • Inquiry

Mondo

  • “Demolition of the Existing Structure to Begin Post Access-Ramp Construction”: Pančevo Bridge Structural Overhaul Officially Underway

    Danijela Rabrenović: "It is crucial to recognize that the existing bridge must be seamlessly integrated into the future evolutionary role of this arterial route within the city. This demands meticulous, highly precise planning to ensure full alignment with the upcoming metro infrastructure designed for this exact location."

    We in the media, Pančevo Bridge, Mondo8. 12. 2025.
Send an inquirySend an inquiry
contact
  • Internacionalnih Brigada 25a
    11118 Beograd (Vračar)
    Srbija

  • +381 (11) 262 1241

  • +381 (63) 513 859

  • office@contentconsultingteam.rs

Company Wall
our location

© 2026 • Content Consulting Team. All rights reserved.

Page load link
Go to Top